Channel and culvert improvements to the major drainage ditch for the area. New storm drainage system with associated detention ponds for two residential areas along Mile 11 N.
Type of Project |
2018 Bond Project |
Engineer |
Javier Hinojosa Engineering |
Contractor |
TBD |
Cost |
TBD |
Status |
In Progress |